Colliers – Sir James Whitney Sitewide Renewal Bundle

Belleville, On

  • Closing Date: February 11, 2025, 02:00PM
  • Architect: Read Jones Christoffersen Ltd.
  • How to Close: estimating@frecon.ca
  • Addendums: 5

Project Description

Project consists of 13 Subdivided projects

230234-274471 Steam Distribution and Condensate R
Replace existing steam and condensate with hydronic heating system at the SJWS Main School (Building A – B11087).

230235-274472 Perimeter Heat System Renewal
replace perimeter radiators and heritage radiators at the SJWS Main School (Building A – B11087).

1087650-273180 Central AHU Distribution Renewal
Replace the MCC, supply and return fans, exhaust fan (to the pool), pre-heat, re-heat coils (x4) and new pool ventilation unit in the penthouse of SJWS Sports Building (Building C – B11112)

1099190-274070 Exhaust Ventilation Renewal (Sport)
Replace 11 exhaust fan units in the rooftop of SJWS Sports Building (Building C – B11112)

230244-274495 Repair – Central Heating Plant
replace 2 heat exchangers and 1 re-heat coil at the SJWS Sports Building (Building C – B11112).

230290-274494 Replace Radiators
Replace 19 wall fin radiators at the SJWS Technical Building (Building E – B11099).

230242-274497 Replace Fan Coils
replace 9 Fan Coils at the SJWS Superintendent’s Residence (Building K – B11092).

230241-274477 Terminal Self-Contained Units Renewal
Replace 6 of Terminal Self-Contained Units at the SJWS Residence (Building L – B11090)

1099199-274071 Underground Steam Distribution Renewal
Replace underground steam and condensate piping, incoming steam piping, outgoing condensate piping, condensate tank and pumps all throughout the SJWS campus.

230239-274473 Partial Piping and Valve Replacement
Replace underground concrete sanitary piping sections all throughout the SJWS campus.

230279-274496 Retaining Wall – Brick Renewal
removal of existing retaining walls and installation of new soft landscaping, sidewalk and asphalt paving.

230519-274594 Pool Waterproofing/Re-tiling (Belleville)
Localized application of sealant, localized tile and concrete repairs, and wholesale grout replacement at the pool complex.

230521-274593 Washroom upgrade-building O (Belleville)
reconfigure approximately 1000 square feet of washroom/shower space in student lodging and convert it to meet current AODA standards and address privacy concerns. The existing space has a total of eight showers (2 open rooms with 4 showers in each) as well as a large open space in a separate room with toilet stalls and sinks. The proposed renovation will provide 4 (four) accessible washrooms including shower, sink, and toilet, with the addition of 1 (one) accessible and 1 (one) non-accessible half baths (toilet and sink)

Please send all questions in writing to estimating@frecon.ca

Trades

    • Division 02 - Exisiting Conditions
      • Demolition
      • Hazardous Material Removal
    • Division 04 - Masonry
      • Masonry
    • Division 07 - Thermal & Moisture Protection
      • Caulking
      • Dampproofing & Waterproofing
    • Division 08 - Openings
      • Aluminum Windows, Curtain Wall, Entrances
      • Doors and Frames
      • Hardware
      • Operators
    • Division 09 - Finishes
      • Drywall
      • Epoxy
      • Flooring
      • Painting & Wallcoverings
    • Division 10 - Specialties
      • Toilet Partitions
      • WA
    • Division 22 - Plumbing
      • Plumbing
    • Division 23 - HVAC
      • HVAC
    • Division 24 - Controls
      • Controls
    • Division 26 - Electrical
      • Electrical
    • Division 31 - Earthwork
      • Earthwork
    • Division 32 - Exterior Improvments
      • Landscaping
      • Paving & Curbs
    • Division 33 - Utilities
      • Utilities
Download Selected Files
Document type Total
Addendums
January 30, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 30, 2025
January 21, 2025
January 21, 2025
January 29, 2025
January 28, 2025
9
Specifications
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
11
Reports
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
17
Drawings
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
January 21, 2025
20